Track and switch renewal

Track renewal (mechanical)

Track renewal trains P95-2008 UM-Schweerbau and P95 UM-P

The performance from the Matisa P 95-2008 track renewal train from Schweerbau impresses time and again. >/= 500 sleepers can be replaced per hour. At the same time, >/= 600 m of track are replaced. In total, 300 m of track and more can be renewed per hour.

schweerbau GmbH - Umbauzug P 95-2008
Track renewal machine P 95-2008